Skip to content

Manufacturing and industry

A stopped line is measured in minutes, not hours. The floor runs locally; management sits at the center.

18
PRODUCTION SITES
4 min
AVERAGE RESPONSE

What we do in this sector

EDGE INFRASTRUCTURE

Systems on the plant floor run locally; the line keeps moving even when the connection drops.

REDUNDANCY PLAN

Redundancy is designed per line, not per plant; critical lines doubled, the rest single.

OT–IT SEPARATION

The production network is never opened to the office network; the crossing between them is audited at one point.

MAINTENANCE WINDOW

Updates follow the shift plan. We keep your production calendar open in front of us.

Companies we work with

Sectors

A question about this sector?

Tell us how things are set up today and we will work out where to start.

Get in touch