Manufacturing and industry
A stopped line is measured in minutes, not hours. The floor runs locally; management sits at the center.
18
PRODUCTION SITES
4 min
AVERAGE RESPONSE
What we do in this sector
EDGE INFRASTRUCTURE
Systems on the plant floor run locally; the line keeps moving even when the connection drops.
REDUNDANCY PLAN
Redundancy is designed per line, not per plant; critical lines doubled, the rest single.
OT–IT SEPARATION
The production network is never opened to the office network; the crossing between them is audited at one point.
MAINTENANCE WINDOW
Updates follow the shift plan. We keep your production calendar open in front of us.
Companies we work with


A question about this sector?
Tell us how things are set up today and we will work out where to start.