SectorRegulated sector
Energy and utilities
An outage is not an option. The architecture spans two sites and the drill is on the calendar.
8
DATA CENTERS · 5 CITIES
99.99%
UPTIME SLA
What we do in this sector
SEGMENTED NETWORK
The field control network is physically separated from the corporate one.
TWO-SITE RECOVERY
Disaster recovery spans facilities in two different cities.
REGULATORY READINESS
The infrastructure-side requirements of a regulator audit are ready before it starts.
LONG-TERM ARCHIVE
Records held unalterable for the full statutory retention period.
A question about this sector?
Tell us how things are set up today and we will work out where to start.